The pair of 780-meter-long tunnels on the 2×2 lane section of the M85 expressway has been completed.

Safe and accident-free traffic is served by 34 cameras, emergency and fire alarm buttons, traffic control LED signs, pavement temperature indicators, traffic counting devices, road pavement active prisms, luminance measurement sensors, ventilation fans, sound and light signaling devices and speakers, he reported on his Facebook page. the Minister of Construction and Investment.


Oops, a new tunnel was delivered in Hungary 1

After the trial run of the Bécsi-domb tunnel, which is one of the biggest domestic road construction projects of the year, and then after the authorization to put it into traffic – while in 2010 there were only 3, soon 11 expressways will reach the national border.

Oops, a new tunnel was delivered in Hungary 2

In 2010, it is from Szekszárd to Pécs A total of four pairs of tunnels were delivered on the M6 (Bátaszék tunnel, Geresd tunnel, Baranya tunnel, Véménd tunnel) the longest is 1331 meters long, in addition there is another 865 meter and two shorter ones: one 418 and one 399 meters long.